Sunday, September 21, 2014

Dumsor is Back



The Siamese twins of (Ghana and Nigeria) are at it AGAIN

Ghana is dependent on Nigeria for gas (fuel) that is used to power the generating plant at Asogli. 
Even though Nigeria is bound by international contract to supply the gas needed to Ghana, “you can NOT get blood out of a turnip”, and labor unrest in Nigeria has compelled the supplier (Nigeria) to suspend the supply of the needed fuel to the end user (Ghana) until the labor issue is resolved.
So Ghana is back to the famous rotating black-out “dumsor”.

This takes us back to the advice I have given in my previous blog, if you plan on doing any kind of manufacturing operation in Ghana, better have a back-up generator or two.

No comments: